Structural repair of RC Slab and Beam in Ground Floor (Shop 1-5) in Al-Amodi Budling
MACE Qatar has been contracted to do the following works in partnership with Al-Badiya Trading and Contracting:
Demolition of existing ceiling and removal of ceiling debris and storage of inventory of installed light fixtures.
Chipping and cutting to remove spalled concrete with at least 15mm behind the rebar.
Checking the rebar condition, cleaning, and if corroded beyond 25% area, replacing it with new steel and applying a zinc-rich coating for corrosion protection.
Form and pump using OVM equipment under a minimum pressure of 5 bars.
Supply and apply all materials from DCP.
Protection board to protect installed tiles.